文献检索/Natural Hazards and Earth System SciencesEM-T1Natural Hazards and Earth System Sciences2016-11-29第 16 卷第 12 期,2473-2484开放获取Roadway backfill method to prevent geohazards induced by room and pillar mining: a case study in Changxing coal mine, ChinaNan ZhouChina University of Mining and TechnologyMeng LiChina University of Mining and TechnologyJixiong ZhangChina University of Mining and TechnologyRui GaoChina University of Mining and Technology去出版社页面 引用论文图谱收藏 被引提醒分享打印登录后看摘要和中文要点英文摘要、AI 生成的中文摘要和三条要点、参考文献和引证文献列表、论文图谱,注册免费。登录 / 注册关键词room-and-pillar mininglongwall mininggeohazardsstreet layoutabutment stressstrata movementland subsidence参考文献33引证文献0相似文献引文网络关联作者相关机构登录后可以看完整列表。去登录论文图谱本篇和它的参考文献、引证文献、相似文献登录后可以看这篇的论文图谱:谁被它引用、谁引用了它、还有哪些相似的研究。登录 / 注册